AM for EnergyAM ResearchIndustrial Additive ManufacturingNuclear EnergyResearch & Education

Freemelt signs with Fusion for Energy to study tungsten tiles manufacturing

Helping the EU advance its ITER project in collaboration with Fraunhofer IGCV

Stay up to date with everything that is happening in the wonderful world of AM via our LinkedIn community.

Freemelt, an EB-PBF 3D printer manufacturer, will lead a feasibility study on behalf of Fusion for Energy (F4E), the EU organization responsible for Europe’s contribution to ITER, together with other experiments in the field of fusion. The study aims to qualify tungsten as a material and conduct application tests for fusion energy applications. Its value is in the range of SEK 3 M and will run for 15 months, starting in the second quarter of 2025.

Freemelt and F4E are collaborating on a feasibility study to qualify tungsten for fusion energy applications.
ITER’s toroidal ring that will hold the plasma is now under construction

“Being trusted to lead this project strengthens our position in the energy sector and further establishes us as a key player in ITER – the international fusion experiment, which will demand an unmatched supply of advanced materials over the coming decades,” said Daniel Gidlund, CEO of Freemelt.

Freemelt in collaboration with Fraunhofer IGCV, part of Fraunhofer, Europe’s leading research organization for industrial applications, will contribute to the new Technology Development Programme of F4E, launched earlier this year, aiming to generate new know-how through R&D actions to bridge knowledge gaps in fusion technologies. This initiative, rolled out by F4E, aligns with the EU’s commitment to becoming more resilient, competitive, and a pioneer in science & technology.

As part of the project, Freemelt and Fraunhofer IGCV will develop methods to optimize the joining of tungsten, which protects against extreme temperatures with copper, efficiently transferring heat to the cooling system.

F4E is responsible for the EU’s contribution to ITER, which roughly amounts to half of the project, with funds coming from the EU budget. One of F4E’s main tasks is consolidating a supply chain for advanced materials, such as tungsten, used in ITER’s chamber walls. The partnership with Freemelt is part of the effort to coordinate research, production, and quality assurance to meet ITER’s extreme heat resistance, radiation tolerance, and lifespan requirements.

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button